We are experienced in working with architects, space planners and engineers to convey technology needs for best possible space design and utilization. Following are typical tasks by construction design phase.
Programming and schematic design
- Requirements definition
- Architect/MEP coordination
- Prepare physical infrastructure plan
- Technology space planning test fits
- Produce schematic design narrative to include MEP direction
- Provide preliminary budget information
Design Development
- Establish and communicate size/location of equipment rooms, power loads, heat loads, floor loading, grounding/bonding, conduit pathway and sizing, etc., to A/E team
- Formalize data center and equipment room design
- Produce design development level drawings and bid specifications
Construction Documents and Bidding
- Produce construction document drawings and finalized specification or RFP
- Bidding and contractor/vendor selection support
|